The 2009 Street Rehabilitation program contract was awarded March 24, 2009. The project is anticipated to begin the first week of April and will be completed in September. Below is a list of the streets scheduled for rehabilitation along with a general scope and estimated date for beginning construction. These dates will be added/updated as they become available. Please note that these dates are tentative and may change as weather conditions vary. Property owners with property adjacent to a street to be rehabilitated will receive a letter in the weeks just prior to beginning construction.
If your street is scheduled to receive new curbs, your driveway will be inaccessible for a period of time as the new curb and drive approach are constructed and allowed to cure. Please pay special attention to signage and notices as they will instruct you to times and dates when alternate parking will be necessary. We ask that adjacent properties which receive new curbs or sidewalk ramps please help the City's efforts to improve the overall neighborhood by watering and tending to grass seed placed by the City contractor in the restoration areas.
The Department of Engineering holds bi-weekly Construction Update meetings on the second and fourth Tuesday of the month at 8:30 AM in the City Hall Council Chambers. Further questions may be directed to Andrew Rodewald at (317)776-6330.
Street | Location | General Scope | Anticipated Begin Date |
South Harbour Drive | Buckeye - Elmwood | Replace curb, mill, resurface | May 11, 2009 |
Hazel Dell Road | E 161st - SR 32 | Final surface | May 11, 2009 |
E 156th Street | Hazel Dell project limits | Final surface | May 11, 2009 |
E 169th Street | Gray - Hazel Dell | Patch, structural overlay | May 11, 2009 |
Greenfield Avenue | Cumberland - Boden | Patch | Complete |
Promise Road | E 191st - E 196th | Patch, structural overlay | May 8, 2009 |
Wellington Northeast | |||
Stony Creek Ovlk | Wellington - Herrimann | Mill, resurface, ramps | May 4, 2009 |
Chesterfield Drive | Wellington - Stony Creek | Mill, resurface, ramps | May 4, 2009 |
Andover Lane | Stony Creek - Chesterfield | Mill, resurface, ramps | May 4, 2009 |
Glouchester Ct | Stony Creek - cul-de-sac | Mill, resurface, ramps | May 4, 2009 |
Brendandow Ct | Stony Creek - cul-de-sac | Mill, resurface, ramps | May 4, 2009 |
Welham Ct | Chesterfield - cul-de-sac | Mill, resurface, ramps | May 4, 2009 |
Moorgate Ct | Chesterfield - cul-de-sac | Mill, resurface, ramps | May 4, 2009 |
Stony Creek Cir | Stony Creek - Stony Creek | Mill, resurface, ramps | May 4, 2009 |
Wellington Pkwy | Allisonville - Herrimann | Mill, resurface, ramps | May 4, 2009 |
Forest Hill Estates | |||
Forest Ridge Dr | Lakeview - cul-de-sac | Spot curb repair, mill, resurface | |
Forest Ridge Dr | Lakeview - Beechwood | Spot curb repair, mill, resurface | |
N Holly Ct | Forest Ridge - cul-de-sac | Spot curb repair, mill, resurface | |
S Holly Ct | Forest Ridge - cul-de-sac | Spot curb repair, mill, resurface | |
N Beechwood Ct | Forest Ridge - cul-de-sac | Spot curb repair, mill, resurface | |
S Beechwood Ct | Forest Ridge - cul-de-sac | Spot curb repair, mill, resurface | |
Old Town | |||
Harrison Street | 10th - 19th | Mill, Resurface (CDBG - ramps) | |
Morton Street | 12th - 19th | Mill, Resurface (CDBG - ramps) | |
12th Street | Clinton - Monument | Mill, Resurface (CDBG - ramps) | |
14th Street | Clinton - North | Mill, Resurface (CDBG - ramps) | |
15th Street | Monument - Roosevelt | Mill, Resurface (CDBG - ramps) | |
16th Street | Conner - Field | Mill, Resurface (CDBG - ramps) | |
18th Street | Harrison - Monument | Mill, Resurface (CDBG - ramps) | |
19th Street | Harrison - Monument | Mill, Resurface (CDBG - ramps) | |
Miscellaneous | |||
Logan Street | SR 19 - SR 38 | Mill, resurface | |
Hollowview Dr | Sunset Dr - Woodview Dr | Mill, resurface, ramps |