The 2009 Street Rehabilitation program contract was awarded March 24, 2009. The project is anticipated to begin the first week of April and will be completed in September. Below is a list of the streets scheduled for rehabilitation along with a general scope and estimated date for beginning construction. These dates will be added/updated as they become available. Please note that these dates are tentative and may change as weather conditions vary. Property owners with property adjacent to a street to be rehabilitated will receive a letter in the weeks just prior to beginning construction.
 
If your street is scheduled to receive new curbs, your driveway will be inaccessible for a period of time as the new curb and drive approach are constructed and allowed to cure. Please pay special attention to signage and notices as they will instruct you to times and dates when alternate parking will be necessary. We ask that adjacent properties which receive new curbs or sidewalk ramps please help the City's efforts to improve the overall neighborhood by watering and tending to grass seed placed by the City contractor in the restoration areas.
 
The Department of Engineering holds bi-weekly Construction Update meetings on the second and fourth Tuesday of the month at 8:30 AM in the City Hall Council Chambers. Further questions may be directed to Andrew Rodewald at (317)776-6330.
 
Street Location General Scope Anticipated Begin Date
South Harbour Drive Buckeye - Elmwood Replace curb, mill, resurface May 11, 2009
Hazel Dell Road E 161st - SR 32 Final surface May 11, 2009
E 156th Street Hazel Dell project limits Final surface May 11, 2009
E 169th Street Gray - Hazel Dell Patch, structural overlay May 11, 2009
Greenfield Avenue Cumberland - Boden Patch Complete
Promise Road E 191st - E 196th Patch, structural overlay May 8, 2009
Wellington Northeast
Stony Creek Ovlk Wellington - Herrimann Mill, resurface, ramps May 4, 2009
Chesterfield Drive Wellington - Stony Creek Mill, resurface, ramps May 4, 2009
Andover Lane Stony Creek - Chesterfield Mill, resurface, ramps May 4, 2009
Glouchester Ct Stony Creek - cul-de-sac Mill, resurface, ramps May 4, 2009
Brendandow Ct Stony Creek - cul-de-sac Mill, resurface, ramps May 4, 2009
Welham Ct Chesterfield - cul-de-sac Mill, resurface, ramps May 4, 2009
Moorgate Ct Chesterfield - cul-de-sac Mill, resurface, ramps May 4, 2009
Stony Creek Cir Stony Creek - Stony Creek Mill, resurface, ramps May 4, 2009
Wellington Pkwy Allisonville - Herrimann Mill, resurface, ramps May 4, 2009
Forest Hill Estates
Forest Ridge Dr Lakeview - cul-de-sac Spot curb repair, mill, resurface
Forest Ridge Dr Lakeview - Beechwood Spot curb repair, mill, resurface
N Holly Ct Forest Ridge - cul-de-sac Spot curb repair, mill, resurface
S Holly Ct Forest Ridge - cul-de-sac Spot curb repair, mill, resurface
N Beechwood Ct Forest Ridge - cul-de-sac Spot curb repair, mill, resurface
S Beechwood Ct Forest Ridge - cul-de-sac Spot curb repair, mill, resurface
Old Town
Harrison Street 10th - 19th Mill, Resurface (CDBG - ramps)
Morton Street 12th - 19th Mill, Resurface (CDBG - ramps)
12th Street Clinton - Monument Mill, Resurface (CDBG - ramps)
14th Street Clinton - North Mill, Resurface (CDBG - ramps)
15th Street Monument - Roosevelt Mill, Resurface (CDBG - ramps)
16th Street Conner - Field Mill, Resurface (CDBG - ramps)
18th Street Harrison - Monument Mill, Resurface (CDBG - ramps)
19th Street Harrison - Monument Mill, Resurface (CDBG - ramps)
Miscellaneous
Logan Street SR 19 - SR 38 Mill, resurface
Hollowview Dr Sunset Dr - Woodview Dr Mill, resurface, ramps