PROJECT DESCRIPTION
Reconstruction of approximately 2.14 miles of Hazel Dell Road from Midland Ln./Noble Crossing Pky. to SR32 as a four-lane divided roadway with center median, curb and gutter, and multi-use trail on both sides. This segment includes one 3-sided bridge structure over Kirkendall Creek and a roundabout at
Reconstruct approximately 0.35 miles of 156th Street as a 2-lane road at the intersection of Hazel Dell Road , with a new bridge structure over Kirkendall Creek and improving the roadway alignment of the existing reverse curve. Reconstruct approximately 0.25 miles of 161st Street as a 2-lane road at the intersection of Hazel Dell Road . Reconstruct approximately 0.23 miles of 169th Street as a 2-lane road at the intersection of Hazel Dell Road . Reconstruct approximately 0.66 miles of the AJ Brock Drain, including storm sewer and open channel grading.
PROJECT COMPLETION
Spring 2009
CITY'S PROJECT MANAGER
Jim Hellmann, P.E.
DESIGN FIRM
American Structurepoint, Inc.
CONTRACTOR
Crider And Crider, Inc.
Associated Documents
- RENDERING: Hazel Dell Road (156th Street) [5MB]
- RENDERING: Hazel Dell Road (161st Street) [5MB]
- RENDERING: Hazel Dell Road (169th Street) [5MB]