The 2019 Sanitary Cured-In-Place Pipe (CIPP) project will rehabilitate approximately 1,700 linear feet of sewer in Old Town Noblesville. The contractor on the project is Granite Inliner and daily coordination will be taking place between the contractor and Noblesville Utilities. The process begins with cleaning of the lines and then installing a resin-based liner. Using CIPP allows the existing sewer system to be repaired without digging up streets and sidewalks. CIPP forms a jointless, seamless pipe within the old pipe. An overall location map of the affected sewer system can be found below. 

During construction, expect lane and alley closures as well as parking disruptions in the work areas over the course of the next three weeks. 